Build & renovate
Renovate or rebuild
Compare two options delivering the same floor area and finish. Include survey findings in the renovation allowance.
Calculation method
A positive difference means renovation costs less. The extra overrun applies to renovation works including retained systems, in addition to the entered contingency.
Key inputs · Renovation works (฿), Retained systems and survey allowance (฿), Accommodation during renovation (฿), Renovation works contingency (%).