Renovation costs
Budgeting a renovation in Thailand, from the quote to the last box
A builder can quote the roof by the metre, insulation by the roll and tiles by the box. Compare the work each price buys before adding the figures to your budget.
What work does the builder’s total include?
One San Kamphaeng quotation includes both an extension roof and work on the existing roof. Its foundation area covers only part of the job. Before comparing renovation with rebuilding, price both options for the same finished floor area and specification.
Case study · Reading a million-baht renovation quote
Compare renovation and rebuild costsHow many rolls will cover the ceiling?
The 118.16 m² ceiling example needs 50 rolls at 2.40 m² per roll. Adding a 5% cutting allowance takes the order to 52. Use the measured ceiling area and the usable coverage printed on your chosen pack.
Case study · Counting rolls for a 118 m² ceiling
Price an insulation orderHow far does a tile allowance go?
A 102 m² floor with a 10% cutting allowance needs 112.20 m² of tile before rounding up to whole boxes. Compare the two whole-box orders, then check which area the builder used for the tile allowance and whether laying materials are included.
Case study · The real cost of buying tiles by the box
Compare two tile orders