There’s Always a Project

A clearer way to build in Thailand

Build wisely.
Live comfortably.

Understand your budget. See what your materials do. Make the big decisions before you start building.

Chiang Mai first. Metric throughout. Assumptions in the open.

YOUR HOME, BETTER UNDERSTOOD
ROOFWALL
A BETTER QUESTIONWhat am I actually
getting for my budget?
01 / FROM IDEAS TO INFORMED CHOICESConcept illustration
01 See the whole budget02 Understand the materials03 Compare the evidence

01 / YOUR BUILD, IN NUMBERS

What could your
house cost?

Start with a rate, then account for the things that are easy to overlook. Every allowance is yours to change.

Your project

Editable scenario

฿17,500/m² is an illustrative starting assumption, not a verified market rate. Enter your builder’s rate and check its inclusions.

Base scope assumed: structure, roof, walls, standard finishes, internal electrical and plumbing. Extras below must only cover work excluded from your base rate.
Other allowances Fees, utilities, kitchen, energy

Applied to house, carport, site, utility, fit-out, energy and other works. Excludes land and professional fees.

THE PART A SQUARE-METRE RATE MISSES

A cheaper rate can mean a smaller scope. Compare the roof specification, wall thickness, openings, kitchen, service works and exclusions before comparing the headline price.

02 / MAKE THE INVISIBLE VISIBLE

How well does it
resist heat?

Choose a material. Change its thickness. See how the resistance changes — and why a roof covering and a layer of insulation do different jobs.

Higher R = more resistance to heat flow. All results here use metric R in m²·K/W. Material comparisons exclude airspaces, surface films, fixings and thermal bridges.

R20imperial material rating→3.52metric R

Compare two materials

MATERIAL R · SAME LINEAR SCALE · HIGHER IS BETTER

This compares selected material layers, not whole walls or roofs. Higher R alone does not establish fire safety, moisture control, acoustic performance or suitability.

THE MATERIAL, UP CLOSE
Selected layer A

Metric R

Schematic texture · visual thickness is exaggerated for legibility.

TRY A COMPARISON

GO ONE LAYER DEEPER

Build a material stack

1D material path

Add layers that sit in one continuous heat path. A ventilated roof void separates the covering from the insulated ceiling; don’t simply add them as a solid stack.

Surface-to-surface temperature difference, not outdoor vs indoor air. No solar absorption, air leakage, weather or temperature lag is simulated.

FROM PERFORMANCE TO PRICE

What would the ceiling insulation cost?

Historical retail material prices from the project reference, 14 October 2026. Excludes labour, delivery, tape and accessories.

Coverage: 2.4 m²/roll. Prices are dated evidence, not current offers. Update them below before ordering. This estimate is separate from your build total to avoid counting insulation twice.

03 / A GOOD DECISION HAS A SOURCE

Useful tools.
Visible assumptions.

This studio shows the method and the limits alongside the result. Numbers should help you ask better questions.

01

Start with the whole scope

Keep land, house, external works and future upgrades separate. Replace example allowances with itemised quotations.

02

Compare like with like

R depends on thickness and product grade. Imperial R, metric R and a whole-system rating cannot be compared as the same number.

03

Check the site, too

Flood exposure, zoning, legal access, soil and drainage need a specific parcel and verified evidence. This studio does not clear a site for purchase or building.

Sources, price dates and calculation notes

Verified web references checked 7 November 2026. Manufacturer figures describe the stated model or range under its test conditions; they do not certify your installation. Project prices are historical reference data. No private addresses, deeds or personal quotations are included.

All calculations run in your browser. No entries are uploaded or saved by this site. Downloading creates a CSV on your device. Rounding is for display only. Reloading restores the example.

Full compliance modelling would also consider surface resistances, mortar/frames, thermal bridges, air gaps, moisture, solar reflectance, ventilation and workmanship. Foil needs a correctly configured airspace; no extra foil R is assigned here.